Monday, April 9, 2012

spring garden week 2 (march 31- apr 7)

grace and molly measuring wood for the coldframes
Monday, 4/3
Darby, Chris, and Patrick painted windows for the cold frames while Grace, Mrs. Barrett, and Molly went to the tech shop to cut the wood. Grace expertly cut diagonal pieces of wood with a jigsaw, while Mrs. Barrett and Molly expertly kept their fingers out of the way. Thanks to a math slipup, one of the boxes has diagonals that are two inches too short. We’re going to try to close the gap with tiny two-inch rectangles of wood.

Tuesday, 4/4
We assembled two full cold frames today and half of a third frame, and we also finished painting the windows. If we were a sports team, Darby would get three claps for her rapidly improving hammering skills and for her patience when she nailed the supports to the outside of the box and had to use her hammering skills to take the supports off and put them back on again.

Wednesday, ⅘
Today we began painting the boxes of the cold frames, and what a perfect day to paint! After days of gray drizzle, today was sunny, breezy, and just warm enough.

Thursday, 4/6
In the garden today, Chris made great strides in painting the second coat on the cold frames. Thanks to Patrick, the garden area is raked free of leaves and the soil in the raised beds is raked flat too. Meanwhile, Grace and I waged an epic war with the fourth cold frame, cutting missing pieces only to nail one to the wrong side of the box, re-nailing when another piece split, and finally finishing only to have one of the two-inch quick fix pieces split at the last minute.The box won this time, but we’ll be back.

darby and molly painting the coldframes

No comments:

Post a Comment